Morse Engineering provided consulting services to the owner of this private dam, which impounds the South River and creates the Chandler’s Mill Pond, an approximate 12-acre freshwater pond. Morse Engineering assisted the owner with preparing Operational Guidelines and Maintenance Procedures for the dam, an Emergency Action Plan in case of Dam failure and Permitted the on-going dam maintenance with the Marshfield Conservation Commission.