27 Linda Lane

Plymouth, MA
  • Replacement of an existing 4-bedroom failed septic system.
  • Performed percolation testing and soils analysis with Plymouth Board of Health.
  • Prepared Septic System Design Plan (approved by Board of Health).
  • Aided owner in soliciting construction bids.
  • Performed construction inspections and prepared As-Built Plan.
27 Linda Lane