Hydraulic Design of cofferdam and by-pass pumping for a culvert repair underneath Washington Street (MassHighway Route 53) at the Weymouth Public Drinking Water Supply Reservoir.
Temporary bypass pumping with backup pumping for 5,000 gallon/minute capacity.
Construction dewatering plan to lower the level of the reservoir at the proposed culvert repair project.