Stormwater Compliance

Ayer, MA

Client
Pepsi, CPF, Inc.

Morse was hired to review this existing 20-acre industrial property for compliance with the EPA NPDES Stormwater Requirements.  Services included the following:

  • – Provide existing conditions topographical survey of 20-acre facility and identify all drainage improvements (catchbasins, pipes, swales etc.) and downstream drainage discharge points.
  • – Prepare EPA Industrial Stormwater Discharge Permit Application.
  • – Inspect interior drainage (floor drains, roof drainage, covered loading bays) improvements and provide interior piping schematic drawing.
  • – Prepare Spill Response Plan and Drainage BMP Operation & Maintenance Plan for entire site.
Stormwater Compliance